CRT Library
Mica Dam Greenhouse
Black and white photograph taken during the construction of the greenhouse at Mica Dam in February 1969. Photo shows a man with a hose.
Author: BC Hydro
Publisher: BC Hydro, United States. Bonneville Power Administration
Date: 1969-02-18
Mica Project Planning: the role of the Columbia River Treaty on its Planning and Initial Operation
This paper, presented at the discusses the planning and initial operation of the Mica Dam project. The factors influencing the initial filling of the reservoir are examined. Treaty operating plans, designed to increase downstream hydroelectric power . . .
Author: Forrest, D.R.
Publisher: Illinois Institute of Technology
Date: 1978
Natural Resource Development and the Role of the State: the Case of Hydroelectric Power Planning in British Columbia
“This thesis explores the role played by the state at the provincial level in the planning of hydro-electric power development in British Columbia. The electric power industry has been a primary focus for government intervention in the economic . . .
Author: Payne, Raymond W.
Publisher: University of British Columbia
Date: 1987
Non-Treaty Storage Agreement
“Non-Treaty storage refers to storage in Columbia River basin projects in Canada that is not required by the Columbia River Treaty. This includes 5 million acre-feet (Maf) in Mica reservoir, 0.262 Maf in Arrow, and storage in Revelstoke and Kootenay . . .
Author: United States. Bonneville Power Administration, BC Hydro
Publisher: United States. Bonneville Power Administration United States. Army Corps of Engineers
Date: 1990
O.K., It’s a Deal
This editorial cartoon was originally published in the Oregon Journal.
“The art accompanied an editorial letter, “Eyes Kept on the Big Prize,” hailing a recent breakthrough in negotiations toward the Canadian ratification of the Columbia River Treaty . . .
Author: Carl Bonelli
Publisher: Oregon Historical Society
Date: 1964-01-23
- «Previous Page
- 1
- …
- 28
- 29
- 30
- 31
- 32
- …
- 58
- Next Page»
