CRT Library
Arrow Dam
Artist’s rendition of High Arrow Dam (later renamed Keenleyside Dam).
Author: United States. Bonneville Power Administration
Publisher: United States. Bonneville Power Administration
Assessing the Impact of Hydro Development: A Case Study of the Columbia River Basin in British Columbia
“Hydro development along the Columbia River has brought major benefits to British Columbia, most notably electric power production and improved flood control. Accompanying these positive effects, however, have been significant local costs associated . . .
Author: Toller, Susan B and Nemetz, Peter N., 1944-
Publisher: BC Studies
Date: 1997
Assured Operating Plans (series)
These documents provide guidelines for the operation of Treaty storage. Each year, the Entities must develop an Assured Operating Plan outlining Canadian Entitlement, flood control, and power objectives for the sixth succeeding year. The Detailed . . .
Author: Columbia River Treaty Operating Committee
Date: 1967 – 2014
Balance of Power: Hydroelectric Development in SouthEastern British Columbia
This interactive website provides information on the development of hydroelectric power in British Columbia, including the effects on First Nations people.
The website can be accessed at . . .
Author: Touchstones Nelson
Publisher: Touchstones Nelson
Date: 2007
Balance of Power: Hydroelectric Development in SouthEastern British Columbia.jpg
- «Previous Page
- 1
- …
- 43
- 44
- 45
- 46
- 47
- …
- 58
- Next Page»
