CRT Library
Columbia River Development: Determination of Canadian Downstream Power Entitlement, Technical Report
One of two reports prepared by Work Group No. 1 on the determination of Canadian downstream power entitlement, specifically looking at storage at Arrow Lakes, Duncan Lake, and Mica. Work Group No. 1 consisted of both Canadian and American officials. This item is the technical report.
Author: Work Group No. 1
Date: 1963-11
